  • Client: Stavros Niarchos Foundation – Health Initiative (SNFHI)
  • Architects: Renzo Piano Building Workshop, in collaboration with Betaplan
  • Architectural Design: Renzo Piano Building Workshop, in collaboration with Betaplan
  • Structural Design: Milan Ingegneria – Penelis Consulting Engineers
  • MEP Design: LDK – Tetras
  • PM: Hill International

Project team

  • Client: Stavros Niarchos Foundation – Health Initiative (SNFHI)
  • Architect: Renzo Piano Building Workshop, in collaboration with Betaplan
  • Health Experts: Llewelyn Davies
  • Structural Engineers: Milan Ingegneria – Penelis Consulting Engineers
  • MEP Engineers: LDK – Tetras
  • Landscape: H. Pangalou & Associates
  • Project Manager: Hill International
  • Main Contractor: AVAX
  • Penelis role: structural engineer with Milan Ingegneria from schematic design through permit, construction documents and Employer’s Requirements, and support during construction

Timber structure

The inpatient floors use a hybrid timber–concrete system. Spruce glulam columns carry paired 220 × 520 mm glulam beams spanning 7.2 m, and seven-layer 220 mm CLT panels span 5.4 m between them. Each CLT panel carries a 70 mm reinforced-concrete topping connected with Ø12 shear connectors, creating a stiff composite floor that acts as a rigid diaphragm and meets hospital vibration criteria.

In the main lobby the central bay is doubled, with the glulam beams supported by Ø36 steel tie rods. The timber frame takes no earthquake load: eighteen reinforced-concrete cores resist 100% of the seismic action (importance class IV, a_g = 0.16 g), and seismic joints divide the building into three units. As a result every timber connection could be designed as a simple pin, using steel spigots, dowels and hooked plates prefabricated in the factory and assembled dry on site. Glulam and CLT are designed to EN 1995 for 60 minutes of fire resistance using the charring method, with intumescent-coated steel connectors and plugged dowel holes.

The hospital is under construction; the timber superstructure was erected in 2025.